Update on: 2021-09-01
App name | 山海星神 Mod APK 1.4.2 |
Version | 1.4.2 |
Update on | 2021-09-01 |
Size | 63.54 MB |
Mod info | x10 ATTACK |
Developer | 火狗創意有限公司 |
Ringtone Downlaod | One Piece Ringtone |
Category | Role Playing |
Get it on Google Play | 山海星神 |
Download original apk | 山海星神 (63.55 MB) |
Other Apps from this developer |
Astral Stairways Mod APK 山海星神 Mod APK Astral Stairways International Mod APK |
Download Links:
山海星神 Mod APK 1.4.2Fast Download (17.3 MB)Use HappyMod App to get faster download!
Download APK (63.54 MB)
* All mod apks are uploaded by users. If there is any infrigement, please send contact us to remove it.
|
To download 山海星神 mod from HappyMod.com.
You need enable the option "Unknown Sources".
1. Click on the above link to download 山海星神 mod APK.
2. Save the file in your device Downloads folder.
3. Now tap on Install and wait for the installation to finish.
4. Once it is done, open the game and start playing it right away.
To download 山海星神 from HappyMod APP, you can follow this:
1. Open your browser and download the HappyMod APK file from HappyMod.com - the only official website of HappyMod.
2. Open Android Settings and go into Privacy or Security.
3. Tap the option to Allow Unknown Sources and enable it.
4. Go to your Android downloads and tap the APK file.
5. Follow the directions on the screen to install it.
6. Search 山海星神 in HappyMod App.
Size | 63.5MB |
Version | 1.4.2 |
Version Code | 81 |
Lang | af am ar az az-AZ be be-BY bg bn bn-BD bs bs-BA ca cs da de el en-AU en-GB en-IN es es-ES es-US et et-EE eu eu-ES fa fi fr fr-CA gl gl-ES gu gu-IN hi hr hu hy hy-AM id in is is-IS it iw ja ka ka-GE kk kk-KZ km km-KH kn kn-IN ko ky ky-KG lo lo-LA lt lv mk mk-MK ml ml-IN mn mn-MN mr mr-IN ms ms-MY my my-MM nb ne ne-NP nl pa pa-IN pl pt pt-BR pt-PT ro ru si si-LK sk sl sq sq-AL sr sr-Latn sv sw ta ta-IN te te-IN th tl tr uk ur ur-PK uz uz-UZ vi zh-CN zh-HK zh-TW zu |
Permission | INTERNET ACCESS_NETWORK_STATE BILLING |
Permission Text |
OTHER: OTHER: Allows applications to open network sockets. Allows applications to access information about networks. |
Min Sdk | 16 |
Min Sdk Txt | Android 4.1、4.1.11 (JELLY_BEAN) |
Target Sdk | 28 |
Target Sdk Txt | Android 9.0 |
Multi Window | No |
Supports Screens | small, normal, large, xlarge |
CPU | armeabi-v7a x86 |
Open GL Int | 0 |
Supports Any Density | Yes |
Densities | 120, 160, 240, 320, 480, 640 |
Uses Feature |
Screen hardware features: other. |
Uses Feature |
Touchscreen hardware features: The app uses the Global System for Mobile Communications (GSM) telephony radio system. The app uses the device's basic two-point multitouch capabilities, such as for pinch gestures, but the app does not need to track touches independently. This is a superset of the android.hardware.touchscreen feature. The app uses the device's advanced multitouch capabilities for tracking two or more points independently. This feature is a superset of the android.hardware.touchscreen.multitouch feature. |
Md5 | E89B158E4BCF988EBD09EB83F5378E87 |
Signature | 61ED377E85D386A8DFEE6B864BD85B0BFAA5AF81 |
Sha256 | A40DA80A59D170CAA950CF15C18C454D47A39B26989D8B640ECD745BA71BF5DC |
Valid From | Fri Feb 29 02:33:46 CET 2008 until: Tue Jul 17 03:33:46 CEST 2035 |
Serial Number | 936eacbe07f201df |
Developer | Android |
OU | Android |
Organization | Android |
Locale | Mountain View |
Country | US |
City | California |
![]() | HappyModBest mod downloader |
Download Apk
山海星神 Mod apk ~ download faster with HappyMod.